Translate

Surah Al-Kahf, Verse 29

وَقُلِ الْحَقُّ مِن رَّبِّكُمْ فَمَن شَاءَ فَلْيُؤْمِن وَمَن شَاءَ فَلْيَكْفُرْ إِنَّا أَعْتَدْنَا لِلظَّالِمِينَ نَارًا أَحَاطَ بِهِمْ سُرَادِقُهَا وَإِن يَسْتَغِيثُوا يُغَاثُوا بِمَاءٍ كَالْمُهْلِ يَشْوِي الْوُجُوهَ بِئْسَ الشَّرَابُ وَسَاءَتْ مُرْتَفَقًا

And say: The truth is from your Lord, so let him who please believe, and let him who please disbelieve; surely We have prepared for the iniquitous a fire, the curtains of which shall encompass them about; and if they cry for water, they shall be given water like molten brass which will scald their faces; evil the drink and ill the resting-place.

Jama Masjid Expansion Project

Dear Brothers/Sisters of our community,
Assalamualaikum Wa-Rahmatullah
By this update, we wish to express our appreciation and thanks for your support for our Masjid, particularly to its expansion project. May Allah reward you plentiful and bless you and your family for helping in His cause.
We wanted to update you about our progress in this project. Since there were code complications and high costs involved in expanding the existing Masjid building, we decided to expand it to the next door building that consists of street-to-street building on the first floor and second floor apartment. About 320,000 US dollars (2 Crores of Rupees) have been spent over the project till now and approximately 10,00,000 US dollars (6-7 Crore Indian Rupees) are required to complete this expansion project of this Masjid. Because Masjid is ancient about 141 years old (Estd. in 1876) covers about 30,000 square feet of area, Masjid also includes a Madarsa Sautul Uloom Mandi Dhanaura in which regular Hifz classes are conducted for kids two times in a day with strength of 200 Hifz students. Masjid Committee has decided to rebuild Masjid thoroughly, Let me explain you, on the ground floor  Madarsa will be settled where Hifz classes program will be provided for our community Children for 500 Students and 1st Floor will be reserved for Salah. Masjid will be equipped with two Minarets having 150 feet of Height. Where one Minaret building Estimated cost is 2,50,000 US Dollars (1.5 Crore Rupees). Five times prayers (Salah) are continue and construction work is in dynamic process.

Under this project, we face lifted the front and back of the existing Masjid and renovated/ remodeled the whole Masjid building and Madarsa building. Installation of 5 units of heating/cooling system is also underway.

We pray and hope that, insha-Allah, this project will be completed within 3.5 years. Then we are planning to build some more facility space on the second floor. In case you have not paid your promised donation, or wish to make further contributions, please do so as soon as you can. It will help us expediting the completion of the project. May Allah bless you and bless all of us and guide us all to the right path.

Waalikumassalam,
Jama Masjid Mandi Dhanaura Distt Amroha,
Jama Masjid Construction Aerial View in 2014
Jama Masjid Backside View in 2014 which is now demolished and currently being rebuilt 
Jama Masjid First Floor Structure after renovation in 2017, Second Floor is Also projected 
UP West, India-244231
d
Jama Masjid Minaret Construction Site in 2014
Jama Masjid Dhanaura Main Gate


Jama Masjid Inside Construction in 2014


Another Portrait of Jama Masjid Construction Site in 2014


Jama Masjid Aerial Views in 2014, this structure has been demolished and being renovated


Jama Masjid new Aerial View in 2017


No comments:

Post a Comment